Construction of the Queensferry Crossing and approach roads in Scotland (part 2)

机译:在苏格兰修建昆斯费里过境通道和引道(第2部分)

获取原文
获取原文并翻译 | 示例
           

摘要

The 1.34 pound billion Queensferry Crossing over the Firth of Forth in Scotland opened to traffic in 2017. As reported in the authors' 2016 paper in this journal, three design-and-build contracts for the works were awarded in 2011 varying in size from 13 pound million to 790 pound million, all under the original project estimates. The crossing opened within 10 weeks of the contract programme and 250 pound million under budget despite adverse weather conditions. This paper, published in two parts, covers the construction period and the challenges overcome in delivering the largest Scottish infrastructure project in a generation. This second part covers the approach viaducts and roads; structural health monitoring system; deck finishing works; community engagement and benefits; outturn cost and programme; and the opening.
机译:耗资13.4亿英镑的昆斯费里渡轮穿越苏格兰的峡湾,于2017年通车。正如作者在该杂志2016年的论文中所报道的那样,2011年该工程的三份设计与建造合同的规模从13份不等亿英镑至790亿英镑,均在原始项目估算之下。尽管天气条件不利,该过境点仍在合同计划的10周内开放,并在预算之内投入250​​亿英镑。本文分两部分发表,涵盖了建设时期和交付一代最大的苏格兰基础设施项目所面临的挑战。第二部分介绍引道高架桥和道路。结构健康监测系统;甲板装修工程;社区参与和利益;支出成本和计划;和开幕。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号