Illegal removal of redundant elements in transmission towers leads to the collapse of transmission structures under moderate winds. Hence, the removal of structural elements in transmission structures promotes economic losses for power utilities. A possible solution that can reduce extraction of steel members, and decrease power outages, is the replacement of steel redundant members with composite material elements and their connection methods. Hence, evaluation of composite redundant members as structural elements is carried out by the finite-element method to analyse the performance in a 400 kV transmission tower. The performance of the composite and steel elements is analysed by tensile and compressive strength and percentage of use under load conditions in a transmission tower. A different connection method is considered and tested to verify the structural adhesive effectiveness according to the loads determined in simulations. The connection of composite redundant members was implemented in 400 kV transmission towers.
机译:非法拆除输电塔中的多余元件会导致中等风速下的输电结构倒塌。因此,去除传动结构中的结构元件会增加电力公司的经济损失。可以减少钢构件的提取并减少停电的一种可能解决方案是用复合材料元件及其连接方法代替钢制冗余构件。因此,通过有限元方法对复合冗余构件作为结构元件进行评估,以分析400 kV输电塔的性能。通过抗拉强度和抗压强度以及输电塔在负载条件下的使用百分比来分析复合材料和钢质元件的性能。考虑并测试了一种不同的连接方法,以根据模拟中确定的载荷来验证结构粘合效果。复合冗余构件的连接在400 kV输电塔中进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号