Construction of the A20 Round Hill tunnels, Kent

机译:肯特A20圆山隧道的建设

获取原文
获取原文并翻译 | 示例
       

摘要

The two 400 m long road tunnels which now carry the A20 through Round Hill in Kent — part of a £65 million improvement scheme associated with the UK Channel Tunnel terminal — are seen by many as a milestone in the history of British tunnelling. The environmental sensitivity of the area resulted in the UK's first road tunnel to be designed and built following the basic philosophy of the New Austrian Tunnelling Method (NATM). Despite unexpectedly poor ground conditions, the method of incremental support and observation proved a success, with movements of the surrounding chalk being less than anticipated. This paper describes the construction of the tunnels and makes particular reference to environmental and safety issues.
机译:两条400米长的公路隧道现在通过A20公路穿过肯特的Round Hill,这是与英国海峡隧道航站楼相关的6500万英镑改进计划的一部分,被许多人视为英国隧道技术史上的一个里程碑。该地区对环境的敏感性促使英国根据新奥地利隧道法(NATM)的基本原理设计和建造了第一条公路隧道。尽管地面条件出乎意料的恶劣,但增量支撑和观察方法还是成功的,周围白垩的运动少于预期。本文描述了隧道的建设,并特别提到了环境和安全问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号