...
首页> 外文期刊>Proceedings of the IEE - Part B: Radio and Electronic Engineering >Route selection and cable laying for the transatlantic cable system
【24h】

Route selection and cable laying for the transatlantic cable system

机译:跨大西洋电缆系统的路线选择和电缆敷设

获取原文
获取原文并翻译 | 示例
           

摘要

The repeatered submarine cables which form the backbone of the transatlantic telephone cable project were installed during the good weather periods of 1955 and 1956. The paper considers the factors entering into the selection of the routes, describes the planning and execution of the laying task, and presents a few observations on the human side of the venture. It also covers briefly the routing of some 55 nautical miles of repeatered submarine-type cable which were trenched in across the neck of the Burin Peninsula in Newfoundland to connect the Terrenceville submarine terminal with the cable station at Clarenville.
机译:在1955年和1956年的好天气期间,安装了构成跨大西洋电话电缆项目骨干的直放式海底电缆。本文考虑了影响选择路线的因素,描述了敷设任务的计划和执行,以及提出了有关合资企业人性化的一些看法。它还简要介绍了约55海里的中继海底电缆的布线,这些电缆在纽芬兰的Burin半岛的脖子上开槽,以连接Terrenceville海底终端和Clarenville的电缆站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号