首页> 外文期刊>Proceedings of the IEE - Part A: Power Engineering >Organization for large-scale grid system tests
【24h】

Organization for large-scale grid system tests

机译:大型网格系统测试组织

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The stability of generating plant on a large interconnected system is a very important consideration of design and operation. Small-scale tests and the development of various types of calculator have provided the machine designer and system planning engineer with useful information, but the ultimate test is that of satisfactory performance in service. Tests on an operational system are very desirable, but before such work is carried out, the operational risks must be weighed against the importance of the results to be obtained. In 1956 it was decided that such an investigation should be made, and for the first time the Central Electricity Authority carried out steady-state and transient generator stability tests on an operational section of the system.
机译:大型互连系统上发电厂的稳定性是设计和运行中非常重要的考虑因素。小型测试和各种类型计算器的开发为机器设计人员和系统规划工程师提供了有用的信息,但最终的测试是在服务中获得令人满意的性能。在操作系统上进行测试是非常可取的,但是在进行此类工作之前,必须权衡操作风险与要获得的结果的重要性。 1956年,决定进行此类调查,并且中央电力局首次对系统的运行部分进行了稳态和瞬态发电机稳定性测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号