首页> 外文期刊>Practice periodical on structural design and construction >Issues in Construction of a Unique Heavily Reinforced Concrete Structure
【24h】

Issues in Construction of a Unique Heavily Reinforced Concrete Structure

机译:独特的钢筋混凝土结构施工中的问题

获取原文
获取原文并翻译 | 示例
           

摘要

The owner of a recently constructed facility described in this paper specifically required that a portion of their facility, referred to as the "concrete structure," be constructed as a self-supporting structure. Additionally, no portion of this concrete structure could bear loads from upper building walls or floors. Structural retaining walls were required to isolate the subgrade portion of the concrete structure from lateral soil loads, while supporting loads of the exterior cladding system and roof structure. These requirements presented a unique construction challenge. The combination of a cast-in-place structural enclosure, exterior tilt-wall panels, and precast double-tee roof members provided a facility that met the owner's criteria.
机译:本文中描述的最近建造的设施的所有者特别要求将其设施的一部分(称为“混凝土结构”)构造为自支撑结构。另外,该混凝土结构的任何部分都不能承受来自上部建筑物墙壁或地板的载荷。需要结构挡土墙以将混凝土结构的路基部分与侧向土壤载荷隔离开,同时支撑外部覆层系统和屋顶结构的载荷。这些要求提出了独特的施工挑战。现浇结构外壳,外部倾斜墙面板和预制双T形屋顶构件的组合提供了符合所有者标准的设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号