...
首页> 外文期刊>Power Systems, IEEE Transactions on >Robust Scheduling for Wind Integrated Energy Systems Considering Gas Pipeline and Power Transmission N–1 Contingencies
【24h】

Robust Scheduling for Wind Integrated Energy Systems Considering Gas Pipeline and Power Transmission N–1 Contingencies

机译:考虑天然气管道和输电N–1突发事件的风能集成能源系统的鲁棒调度

获取原文
获取原文并翻译 | 示例
           

摘要

The security of natural gas network and the wind power uncertainty bring new challenges for power system operation. This letter develops a robust scheduling model for wind-integrated energy systems with the considerations of both gas pipeline and power transmission N–1 contingencies. The proposed method is robust against wind power uncertainty to ensure that the system can sustain possible N–1 contingency event of gas pipeline or power transmission line. Case studies demonstrate the effectiveness of the proposed model.
机译:天然气网络的安全性和风力发电的不确定性给电力系统的运行带来了新的挑战。这封信为天然气综合能源系统开发了一个健壮的调度模型,同时考虑了天然气管道和输电N-1意外情况。所提出的方法对于风力发电的不确定性具有鲁棒性,以确保系统能够维持可能发生的天然气管道或输电线路的N-1意外事件。案例研究证明了该模型的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号