...
首页> 外文期刊>IEEE Transactions on Power Systems >Risk due to load forecast uncertainty in short term power systemplanning
【24h】

Risk due to load forecast uncertainty in short term power systemplanning

机译:短期电力系统规划中由于负荷预测不确定性导致的风险

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper presents a methodology to analyze the risk of shortnterm power system operational planning in the presence of electricalnload forecast uncertainty. As the authors' methodology requires annestimate of the load forecast variance, a Bayesian load forecaster isnused in the practical implementation. They express their results as anfunction of forecast lead time from one to five days into the future, innterms of $/MWH. The risk due to load forecast uncertainty is based onnthe forecast variance, and found by determining the expected cost ofnperfect information. They illustrate their risk evaluation method in ancase study with utility-derived power system data and temperaturenforecast data from the US National Weather Service
机译:本文提出了一种在存在电力负荷预测不确定性的情况下分析短期电力系统运行计划的风险的方法。由于作者的方法需要对负荷预测方差进行重新估计,因此在实际实施中未使用贝叶斯负荷预测器。他们将结果表示为预测交货时间(从未来的一到五天,以$ / MWH为单位)的函数。负荷预测不确定性引起的风险基于预测方差,并通过确定完美信息的预期成本来发现。他们在案例研究中用公用事业衍生的电力系统数据和美国国家气象局的温度预报数据说明了他们的风险评估方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号