【24h】

HRSG Inspections

机译:HRSG检查

获取原文
获取原文并翻译 | 示例
       

摘要

The "boom" in gas-fired power plant construction of the late 1990s and early 2000s led to capacity margins exceeding 20 percent throughout much ot North America. This capacity glut, combined with soaring natural-gas prices, drove many existing combined-cycle plants off-line for months at a time-essentially mothbailing them until brighter economic conditions might return. Those fortunate to run at all typically ran at unusually low capacity factors, with daily start/stops becoming the norm for formerly baseload facilities. By 2006, moderated natural gas prices and diminished capacity margins-helped by the "bust" in new construction and a sweltering summer-enabled many combined-cycle plants to return to service. In accounting offices, that turnaround means a potentially profitable year.
机译:1990年代末和2000年代初,燃气电厂建设的“热潮”导致整个北美大部分地区的发电能力利润率超过20%。这种产能过剩,加上天然气价格飞涨,使许多现有的联合循环电厂脱机数月,这基本上使它们停滞不前,直到经济状况好转之前。那些幸运地运行的设备通常以异常低的容量因素运行,每天的起/停已成为以前的基本负载设施的标准。到2006年,由于新建工程的“萧条”和夏季闷热,天然气价格适中,产能利润率下降,许多联合循环电厂得以重新投入使用。在会计事务所,这一转变意味着可能会盈利的一年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号