首页> 外文期刊>Power Engineering >OFF SITE BUILD AND TRANSPORT- A unique solution to a UNIQUE problem
【24h】

OFF SITE BUILD AND TRANSPORT- A unique solution to a UNIQUE problem

机译:异地建造和运输-一种独特问题的独特解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

PSEG's new Sewaren 7, a 540 MW combined cycle generating facility in Woodbridge, New Jersey was put out to bid for mechanical contractors in August of last year. On many levels, it was a typical bid package: a gas fired combined cycle power plant consisting of a GE centerline package, a GE/ Alstom designed C-Frame HRSG, a 20 cell ACC, and the balance of plant piping and equipment. The project did, however, present two major challenges. First, the schedule was extremely aggressive - 11 months from turbine delivery to First Fire. This was achievable, but would require a lot of careful upfront planning and coordination between contractors. Second, the site was extremely small, and elevated on an 8-foot-tall island.
机译:PSEG的新Sewaren 7是一台540 MW联合循环发电设施,位于新泽西州伍德布里奇,已于去年8月开始竞标机械承包商。在许多层面上,这是一个典型的投标方案:一个燃气联合循环发电厂,由GE中线方案,GE /阿尔斯通设计的C型机架HRSG,20单元ACC以及工厂管道和设备的余量组成。但是,该项目确实带来了两个主要挑战。首先,时间表非常激进-从涡轮机交付到First Fire的11个月。这是可以实现的,但将需要承包商之间进行大量仔细的前期计划和协调。其次,该场地非常小,位于一个8英尺高的岛上。

著录项

  • 来源
    《Power Engineering》 |2017年第11期|68-70|共3页
  • 作者

    STEVEN THOMPSON;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:23:17

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号