Determining the planning period of a distribution substation based on acceptable errors

机译:根据可接受的误差确定配电变电站的计划周期

获取原文
获取原文并翻译 | 示例
       

摘要

The distribution substation planning is faced with numerous uncertainties so that the planning result can only be a "rough outline," and the problem of determining the planning period arises. On the basis of the assessment of uncertainties in distribution planning, a specific approach to determine the planning period of a distribution substation based on acceptable errors is proposed, indicating that the load forecast error is the key factor to affect the planning period. In order to provide a clearer understanding of this paper’s primary objective, the proposed approach is applied to determining the planning period of a power supply radius optimization (PSRO) model in distribution substation planning. Finally, an example is illustrated which validates the suggested approach of this paper.
机译:配电变电站规划面临许多不确定性,因此规划结果只能是“粗略的概述”,并且会出现确定规划周期的问题。在配电规划不确定性评估的基础上,提出了一种基于可接受误差确定配电变电站规划周期的具体方法,表明负荷预测误差是影响规划周期的关键因素。为了更清楚地了解本文的主要目标,建议的方法用于确定配电变电站规划中的电源半径优化(PSRO)模型的规划周期。最后,通过一个例子验证了本文提出的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号