...
首页> 外文期刊>Power and Energy Systems, CSEE Journal of >Simultaneous placement of tie-lines and distributed generations to optimize distribution system post-outage operations and minimize energy losses
【24h】

Simultaneous placement of tie-lines and distributed generations to optimize distribution system post-outage operations and minimize energy losses

机译:立即放置系列和分布代,以优化分配系统的停电后运营,最大限度地减少能量损失

获取原文
获取原文并翻译 | 示例
           

摘要

This study proposes a new method which aims to optimally install tie-lines and distributed generations simultaneously. This is done to optimize the post-outage reconfiguration and minimize energy losses and energy not supplied of distribution systems. The number and location of tie-lines, as well as the number, size, and location of DGs, are pinpointed through teaching the learning-based optimization (TLBO) method. The objective function in the current research is to minimize the costs pertaining to the investment, operation, energy losses, and energies not supplied. In addition to the normal operational condition, fault operational condition is also evaluated. Therefore, the optimal post-fault reconfigurations for fault occurrences in all lines are established. Moreover, the operational constraints such as the voltage and line current limits are taken into account in both normal and post-fault operational modes. Finally, the modified IEEE 33-bus and 69-bus distribution test systems are selected and tested to demonstrate the effectiveness of the simultaneous placement of DGs and tie-line technique proposed in this paper.
机译:本研究提出了一种新方法,旨在同时最佳地安装扎线和分布代。这样做是为了优化后续停止重新配置,并最大限度地减少不提供分配系统的能量损耗和能量。通过教导基于学习的优化(TLBO)方法,确定扎线的数量和位置,以及DG的数量,大小和位置。目前研究中的目标函数是最大限度地减少未提供的投资,操作,能源损失和能量的成本。除了正常运行条件外,还评估了故障操作条件。因此,建立了所有线路中的故障发生的最佳故障后重新配置。此外,在正常和故障后的操作模式中考虑了诸如电压和线电流限制的操作约束。最后,选择并测试改进的IEEE 33-母线和69母线分配测试系统,以证明在本文中提出的DGS和系带技术同时放置的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号