首页> 外文期刊>IEEE Transactions on Power Delivery >Grounding measurements at the Itaipu generating complex using the 'extended Eleck method'
【24h】

Grounding measurements at the Itaipu generating complex using the 'extended Eleck method'

机译:伊泰普发电厂综合体的接地测量,采用“扩展的Eleck方法”

获取原文
获取原文并翻译 | 示例
           

摘要

Measurements carried out on the interconnected grounding systems of the three main substations of Brazil's Itaipu generating complex are described. These include ground mat resistances, ground impedances seen from each substation, ground potential rise, and mesh potential. The small magnitude of these ground system parameters as well as the interconnection between several nearby ground mats through the ground-wires of the 500 kV and 220 kV lines suggested the utilization of the measurement procedures introduced by A. Eleck (1962), modified for use with aluminium-cable steel-reinforced (ACSR) ground wires. The measured values showed good agreement with previously computed values. The procedures can be used to carry out grounding measurements at a single substation or to carry out simultaneous grounding measurements at two or more nearby substations, as reported here. It is shown that drastic reduction of the mat current and ground potentials is obtained by the utilization of ACSR ground-wires on some line spans near the substations, allowing the utilization of a ground mat conductor spacing several times bigger than if steel ground-wires had been used.
机译:描述了在巴西Itaipu发电站的三个主要变电站的互连接地系统上进行的测量。这些包括接地垫电阻,从每个变电站看到的接地阻抗,接地电势上升和网格电势。这些接地系统参数的幅度很小,以及通过500 kV和220 kV线路的接地线通过几个相邻的接地垫之间的互连,建议使用由A. Eleck(1962)引入并经过修改以供使用的测量程序。使用铝电缆钢加强(ACSR)接地线。测量值与先前计算的值显示出良好的一致性。如此处所述,该过程可用于在单个变电站中进行接地测量,或在两个或多个附近的变电站中同时进行接地测量。结果表明,通过在变电站附近的某些线路跨度上使用ACSR地线,可以大大降低垫电流和地电位,从而允许使用的地垫导体间距比钢制地线的间距大几倍。被使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号