首页> 外文期刊>IEEE Transactions on Power Delivery >Committee report-recommended practice on specific aspects of cable installation in power-generating stations
【24h】

Committee report-recommended practice on specific aspects of cable installation in power-generating stations

机译:委员会关于发电站电缆安装特定方面的报告推荐做法

获取原文
获取原文并翻译 | 示例
           

摘要

Task Force 14-1 was formed within the Insulated Conductors Committee (ICC) to investigate the appropriateness of the guidance presented in IEEE standards addressing design and installation of cable systems in power stations, in light of recent testing by installation contractors and cable manufacturers, as well as comments by various members. A survey questionnaire was circulated to all of the ICC to determine areas in which either current practice differs from the IEEE standards of differing opinions exists in aspects of cable installation not currently covered. Survey results highlighted a need for investigation and recommendation on specific cable installation practices. Additional data were gathered from cable manufacturers, utilities, and engineering firms. Recommendations and information obtained by the committee are presented.
机译:根据安装承包商和电缆制造商的最新测试,绝缘导体委员会(ICC)中成立了14-1工作队,以研究IEEE标准中针对电站电缆系统的设计和安装的指南的适用性。以及各成员的评论。向所有ICC分发了一份调查问卷,以确定当前实践与IEEE标准存在分歧的领域,这些领域在当前未涵盖的电缆安装方面存在不同意见。调查结果强调需要针对特定​​的电缆安装方法进行调查并提出建议。从电缆制造商,公用事业和工程公司收集了其他数据。介绍了委员会获得的建议和信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号