...
首页> 外文期刊>IEEE Transactions on Power Delivery >A modified dynamic programming algorithm for sizing, locating and timing of feeder reinforcements
【24h】

A modified dynamic programming algorithm for sizing, locating and timing of feeder reinforcements

机译:改进的动态规划算法,用于确定支线钢筋的尺寸,位置和时间

获取原文
获取原文并翻译 | 示例
           

摘要

The design of reinforcements for existing distribution feeders is a time-dependent problem. A new optimization algorithm for solving this problem is presented. The optimization method is based on modified dynamic programming, the voltage drop limit is taken into account during the optimization. The problem is not therefore a fixed net-problem, and the basic principle of dynamic programming has to be modified. Experience with the method indicates that the algorithm is valid and effective in practical design work.
机译:现有配电馈线的加强件设计是一个与时间有关的问题。提出了一种解决该问题的优化算法。优化方法基于修改后的动态编程,在优化过程中考虑了压降限制。因此,问题不是固定的网络问题,必须修改动态编程的基本原理。该方法的经验表明该算法在实际设计工作中是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号