...
首页> 外文期刊>IEEE Transactions on Power Delivery >A Risk Evaluation Based Approach to Replacement Strategy of Aged HVDC Components and Its Application at BCTC
【24h】

A Risk Evaluation Based Approach to Replacement Strategy of Aged HVDC Components and Its Application at BCTC

机译:基于风险评估的老直流输电部件更换策略方法及其在BCTC中的应用

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a risk evaluation based approach to the replacement strategy of aged HVDC components. It includes estimation of unavailability of individual HVDC components due to aging failures, calculation of capacity state probabilities of the HVDC system, quantified risk evaluation of the power system containing the HVDC link and benefit/cost analysis for different replacement strategies. The presented approach can be also applied to other system components. The replacement strategy for an aged submarine cable of the HVDC link in a power supply system at British Columbia Transmission Corporation has been analyzed as an example to demonstrate the actual application. The procedure of the analysis has been explained in detail in the example.
机译:本文提出了一种基于风险评估的老化HVDC组件更换策略方法。它包括评估由于老化故障而导致的各个HVDC组件的不可用性,HVDC系统容量状态概率的计算,包含HVDC链路的电力系统的量化风险评估以及针对不同更换策略的收益/成本分析。所提出的方法也可以应用于其他系统组件。以不列颠哥伦比亚输电公司的电源系统中的HVDC链路老化的海底电缆的替换策略为例,以演示其实际应用。该示例中已详细说明了分析过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号