...
首页> 外文期刊>Power Delivery, IEEE Transactions on >Switching Overvoltage Measurements and Simulations—Part I: Field Test Overvoltage Measurements
【24h】

Switching Overvoltage Measurements and Simulations—Part I: Field Test Overvoltage Measurements

机译:开关过电压测量和仿真—第一部分:现场测试过电压测量

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the work carried out by the IEEE Working Grou[ on field-measured overvoltages and their analysis for validating power system component models to be used in switching transients studies. The work uses measurement data obtained from field tests performed by Bonneville Power Administration in June 1995 where switching overvoltages were measured on one of its 230 kV lines. This paper includes a description of the switching tests and the main results derived from field measurements. Details of the switching procedures that were followed to calibrate component models used to match field-recorded waveforms can be found in the Part II paper.
机译:本文介绍了IEEE工作组在现场测量的过电压方面所做的工作及其分析,以验证用于开关暂态研究的电源系统组件模型。这项工作使用了1995年6月由邦纳维尔电力局进行的现场测试获得的测量数据,其中在其230 kV线路之一上测量了开关过电压。本文介绍了开关测试以及从现场测量中得出的主要结果。在第二部分的论文中可以找到校准用于匹配现场记录波形的组件模型所遵循的开关过程的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号