...
首页> 外文期刊>Port Engineering Management >Concrete poured in new locks
【24h】

Concrete poured in new locks

机译:混凝土浇筑新的锁

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Panama Canal Expansion Programme has made a significant stride forward as it reached 3m m3 of concrete poured in the construction of the new lock complexes for the Expansion Programme. The milestone was registered during the construction of the new locks in the Atlantic side, specifically in the second monolith located in the east wing wall water outlet. The wing walls are located at the opposite ends of the lock complexes, where the enormous culverts that are part of the lateral filling and emptying system of the locks finish. The term monolith refers to each of the sections in which the lock walls are being divided to facilitate their construction.
机译:巴拿马运河扩建计划取得了长足的进步,在为扩建计划建造新的船闸群时,浇筑的混凝土达到了300万立方米。在建造大西洋一侧的新船闸时,特别是在位于东翼墙出水口的第二个整体中,这一里程碑被记录下来。机翼壁位于锁复合体的相对两端,在这里,巨大的涵洞即为锁的横向填充和排空系统的一部分。术语整体式是指将锁壁分开以方便其构造的每个部分。

著录项

  • 来源
    《Port Engineering Management》 |2013年第5期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号