首页> 外文期刊>Platts Nuclear Fuel >Holtec submits amendment, plans another
【24h】

Holtec submits amendment, plans another

机译:Holtec提交修正案,计划另外一个

获取原文
           

摘要

Holtec International submitted another amendmentnrequest for the Hi-Storm 100 spent fuel storage system Nov.n7, seeking to tie up some loose ends discovered after usersnbegan implementing amendment 2. The request was notnpublicly available at press time. NRC was conducting annacceptance review. But an official said it involves sevennchanges to the certificate of compliance and technical specificationsnthat are “fairly discrete.” Holtec licensing chiefnStefan Anton characterized the changes as “minor,” sayingnthey include such things as changes to the soluble boronnlevel requirements, expanding the definition of fuel debris,nand updating the helium leak test requirements. None of thenchanges required extensive calculations, according to Holtec.nAnton said Holtec hopes NRC will approve amendment 4nbefore it completes work on amendment 3.
机译:Holtec International于11月7日提交了对Hi-Storm 100乏燃料存储系统的另一项修正要求,力图解决用户开始实施修正2后发现的一些松散问题。该请求在发稿时尚未公开。 NRC正在进行纳婚审查。但是一位官员说,这涉及到“相当离散”的合规证书和技术规范的变更。 Holtec许可负责人Stefan Anton将更改描述为“次要”,并表示其中包括可溶硼水平要求的更改,燃料碎片定义的扩展以及氦气泄漏测试要求的更新。 Holtec表示,随后的变更都不需要进行大量计算。nAnton表示,Holtec希望NRC在完成第3次修订工作之前批准第4n次修订。

著录项

  • 来源
    《Platts Nuclear Fuel》 |2005年第24期|P.10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号