...
首页> 外文期刊>NuclearFuel >Opening of Japan’s RFS spent fuel storage facility delayed to fiscal 2023
【24h】

Opening of Japan’s RFS spent fuel storage facility delayed to fiscal 2023

机译:日本的RFS开放燃料储存设施延迟到2023财年

获取原文
获取原文并翻译 | 示例

摘要

Japan’s Recyclable-Fuel Storage Co. has delayed opening of its interimspent fuel storage facility at Mutsu City in Aomori prefecture fromOctober to fiscal year 2023, which ends March 31, 2024, companyspokesman Hiroshi Koda said in an interview July 27.Additional construction work on the facility, which was started in2019, will be completed in fiscal 2023, instead of during fiscal 2021 aspreviously planned, Koda added. The announcement is the eighthdelay of the start of operations at the facility.
机译:日本的可回收燃料储存公司已延迟开放其临时 来自青森市的Mutsu City的燃料储存设施 10月至2023财年,结束于2024年3月31日,公司 发言人Hiroshi Koda在7月27日的采访中表示。 额外的建筑工程在设施中开始 2019年,将在2023财年内完成,而不是在2021财年期间 以前计划了,柯达补充道。 该公告是第八次 延迟设施的运营开始。

著录项

  • 来源
    《NuclearFuel 》 |2021年第16期| 5-5| 共1页
  • 作者

    Staff Shota Ushio;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号