...
首页> 外文期刊>Platt's Metals Daily >Zambia’s Muliashi mine starts copper cathode output
【24h】

Zambia’s Muliashi mine starts copper cathode output

机译:赞比亚Muliashi矿开始生产阴极铜

获取原文
获取原文并翻译 | 示例

摘要

China Nonferrous Metal Corp. saidnWednesday it has started producingncopper cathode at its $380 millionnMuliashi Copper Project in Zambia andnhas already produced 400 mt of copperncathode. Muliashi Deputy CEO RobertnKamanga said the mine produced itsnfirst copper cathode in April and wouldnproduce 42,000 mt/year of the material.nCNMC bought the Muliashi assets,ntogether with Baluba copper mine, forn$50 million from Luanshya CoppernMines, which was previously majorityownednby UK-based Enya Holdings.nConstruction of the Muliashi projectnstarted in March 2010 and was completednsix months ahead of schedulenin December 2011
机译:中国有色金属公司周三表示,已经开始在其3.8亿美元的赞比亚Muliashi铜项目中生产铜阴极,并且已经生产了400吨铜阴极。 Muliashi副首席执行官RobertnKamanga表示,该矿场于4月生产了第一座阴极铜,年产量将达到42,000吨.nCNMC与Baluba铜矿一起以5000万美元的价格从Luanshya CoppernMines手中收购了Muliashi资产,该矿山之前由英国的Enya拥有Muliashi项目的建设始于2010年3月,比2011年12月提前了6个月完成

著录项

  • 来源
    《Platt's Metals Daily》 |2012年第516期|p.2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号