首页> 外文期刊>Platts Megawatt Daily >Fall nuclear refueling outages could be up 36%
【24h】

Fall nuclear refueling outages could be up 36%

机译:秋季核燃料停运可能增加36%

获取原文
获取原文并翻译 | 示例
       

摘要

This fall’s nuclear refueling season, which kicked off last Monday with the St. Lucie Unit 2 plant in southern Florida, is expected to be much busier than last fall’s outage season. The season, which will conclude in late December, is expected to include 30 units totaling 30,874 net MW going offline, a 36% increase from the capacity that went offline for refueling in the second half of 2014, when 23 units totaling 22,690 net MW shut.
机译:今年秋天的核燃料补给季节始于上周一,在佛罗里达州南部的圣露西2号装置开始,预计将比去年秋天的停运季节更加繁忙。该季节将于12月下旬结束,预计将包括30个脱机机组,总计30,874净兆瓦,比2014年下半年脱机加油的容量增加36%,2014年下半年关闭了23个机组,总计22,690净兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号