首页> 外文期刊>Platts Megawatt Daily >FERC : Spare parts service 'prudent' move
【24h】

FERC : Spare parts service 'prudent' move

机译:FERC:备件服务“谨慎”行动

获取原文
获取原文并翻译 | 示例
       

摘要

A decision by a transmission owner to enroll in a subscription servicernthat would offer fast access to spare critical transmission equipmentrnduring an emergency would be deemed "prudent," the Federal EnergyrnRegulatory Commission said in an order offering regulatory clarity forrnprospective subscribers of the proposed service.rnThe subscription service's developer, Grid Assurance, plans tornacquire and warehouse critical transformers, circuit breakers and otherrntransmission equipment vital to the resilience of its subscribers. Thesernspare parts would be released to utility subscribers in the US andrnCanada as needed to respond to “qualifying events,” such as physicalrnor cyber attacks, electromagnetic pulses, solar storms, windstorms,rnearthquakes, fires or severe weather.
机译:联邦能源监管委员会在一项命令中规定,为拟议服务的潜在订户提供监管明确性,该决定由输电拥有者决定注册订阅服务,以便在紧急情况下可以快速访问备用的关键输电设备。该服务的开发商Grid Assurance计划对关键的变压器,断路器和其他传输设备进行购置和仓储,这对于其订户的复原力至关重要。这些零件将根据需要向美国和加拿大的公用事业用户发布,以响应“合格事件”,例如物理网络攻击,电磁脉冲,太阳风暴,暴风雨,地震,火灾或恶劣天气。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0331期|9-10|共2页
  • 作者

    Jasmin Melvin;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:47:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号