首页> 外文期刊>Platts Megawatt Daily >Sabal Trail flows stand at zero for seventh day
【24h】

Sabal Trail flows stand at zero for seventh day

机译:Sabal Trail流量第七天为零

获取原文
获取原文并翻译 | 示例
       

摘要

There was no natural gas flowing Monday for the seventh consecutive day on the Sabal Trail Transmission pipeline, which is designed to feed growing demand for gas in Florida. It is the longest period of non-flow since the pipeline started up in June, data compiled by Platts Analytics’ Bentek Energy show. A joint venture of Spectra Energy Partners, NextEra Energy and Duke Energy, Sabal Trail is one of three components of the Southeast Market Pipelines Project. The other components are Transcontinental Gas Pipe Line’s Hillabee Expansion and the Florida Southeast Connection. The flow development is unusual considering that winter is approaching. It could be contract-related. Duke’s Florida affiliate held 300 MMcf/d of capacity on Sabal Trail to receive gas from Transco Zone 4 Pool in Choctaw County, Alabama, via leased capacity on Transco, and deliver it to Gulfstream in Osceola County, Florida.
机译:萨巴尔径传输管道周一连续第七天没有天然气流入,该管道旨在满足佛罗里达州日益增长的天然气需求。普氏分析的Bentek Energy汇编的数据显示,这是自6月管道启动以来最长的无流量期。 Sabal Trail是Spectra Energy Partners,NextEra Energy和Duke Energy的合资企业,是东南市场管道项目的三个组成部分之一。其他组件是横贯大陆的天然气管道的Hillabee扩建和Florida Southeast Connection。考虑到冬天临近,流量的发展是不寻常的。这可能与合同有关。杜克公司在佛罗里达州的附属公司在Sabal Trail上的产能为300 MMcf / d,可通过Transco的租赁能力从阿拉巴马州乔克托县的Transco 4区游泳池接收天然气,再将其输送到佛罗里达州奥西奥拉县的湾流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号