首页> 外文期刊>Platts Megawatt Daily >FERC approves ISO-NE 'clustering' proposal
【24h】

FERC approves ISO-NE 'clustering' proposal

机译:FERC批准ISO-NE“集群”提案

获取原文
获取原文并翻译 | 示例
       

摘要

ISO New England's plan to study interconnection requests on a cluster basis won sign-off Tuesday from the US Federal Energy Regulatory Commission despite criticism from renewable energy companies and groups that the proposal was riddled with flaws. ISO-NE proposed incorporating a "clustering approach" into its generator interconnection procedures (ER17-2421) on September 1 following extensive stakeholder discussions aimed at alleviating the interconnection queue backlog in northern and western Maine, and elsewhere on the New England transmission system should similar conditions arise in the future.
机译:尽管可再生能源公司和团体批评该提案充满缺陷,但新英格兰ISO的基于集群研究互连请求的计划周二获得了美国联邦能源管理委员会的批准。在利益相关者广泛讨论以减轻缅因州北部和西部以及新英格兰传输系统其他地方的互连队列积压之后,ISO-NE于9月1日提议在其发电机互连程序(ER17-2421)中纳入一种“集群方法”。将来会出现情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号