...
首页> 外文期刊>Platts Megawatt Daily >AES raises $2 billion for new California units
【24h】

AES raises $2 billion for new California units

机译:AES为加利福尼亚的新部门筹集了20亿美元

获取原文
获取原文并翻译 | 示例
           

摘要

AES said Wednesday it has closed on nearly $2 billion in long-term,rnnon-recourse financing for its 1,384-MW Southland repowering projectrnin Southern California that is in response to the state’s once-throughrncooling regulations.rnThe financing will go toward building two air-cooled combinedcyclerngas facilities to replace two coastal facilities — one in LongrnBeach and the other in Huntington Beach — along with the installationrnof a 100-MW battery-based storage facility slated for the Long Beachrnfacility. The company put the total project cost at $2.3 billion.
机译:AES公司周三表示,已经为其南加州的1,384兆瓦南国供电项目完成了近20亿美元的长期无追索权融资,这是对该州一度过冷的法规的回应。冷却的联合循环天然气设施取代了两个沿海设施,一个位于LongrnBeach,另一个位于亨廷顿海滩,以及为长滩岛设施安装的100兆瓦电池存储设施。该公司估计项目总成本为23亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号