...
首页> 外文期刊>Platts Megawatt Daily >SPP to add 4.1 GW of wind generation through the end of the year
【24h】

SPP to add 4.1 GW of wind generation through the end of the year

机译:通过年底增加4.1 GW的风发电

获取原文
获取原文并翻译 | 示例
           

摘要

Southwest Power Pool expects to add 4.15 GW of new generation by the end of the year, mostly from wind-powered resources across its footprint, according to a generation interconnection active request report compiled Sept. 21. The 4.15 GW includes generation that has executed interconnection agreements and is listed as "on schedule" with commercial operation dates between October and December, according to the report. All of the proposed generation is wind, except 17 MW of natural gas-fired generation slated to come online in October.
机译:根据9月21日编辑的一代互连活动请求报告,西南电力游泳池预计将增加4.15 GW的新一代新一代新一代新一代新一代,主要来自其占地面积的占地面积。4.15 GW包括执行互连的生成根据该报告,协议和12月之间的商业运营日期列为“按计划”。所有拟议的一代都是风,除了17兆瓦的自然燃气发电,10月份上市。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号