...
首页> 外文期刊>Platts Megawatt Daily >FERC clears new MISO process for restoring power, allocating costs after blackouts
【24h】

FERC clears new MISO process for restoring power, allocating costs after blackouts

机译:FERC清除新的MISO流程来恢复电源,在停电后分配成本

获取原文
获取原文并翻译 | 示例
           

摘要

Midcontinent Independent System Operator was given the go-ahead to institute a new framework for handling the restoration of power and allocation of costs associated with that effort. The new permanent framework for handling a restoration event replaces what MISO called an inefficient process of addressing these events on a case-by-case basis. With FERC's sign-off, MISO can proceed with adding Schedule 52 to its tariff. The new schedule is intended to "make the process of recovery and allocation of costs more efficient and timely, ensuring that each event is treated in the same manner, and provide market participants advance notice of how a restoration event will be handled," MISO said in its April 28 filing (ER20-1673).
机译:中间地区独立系统运营商获得了预先提升的新框架,用于处理恢复权力和与该努力相关的成本的分配。用于处理恢复事件的新的永久框架替换了含义逐个案例地解决这些事件的误报。通过FERC的签字,MISO可以继续向其关税添加时间表52。新的时间表旨在“使成本更高且及时的成本进行恢复和分配过程,确保每项活动都以相同的方式处理,并提供市场参与者提前通知如何处理恢复事件,”Miso表示在4月28日提交(ER20-1673)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号