A Washington state public utility has recently purchased an electrolyzer to produce hydrogen using excess hydropower. The Douglas County Public Utility District, in East Wenatchee, Washington, is purchasing a 5-MW Proton Exchange Membrane electrolyzer built by Cummins that it hopes to have operational by late fall or early next year, said utility spokeswoman Megan Vibbert on Aug. 28.
展开▼