Appeals court rejects Maryland utility's bid to recover $38 million in tax costs

机译:上诉法院驳回马里兰州公用事业公司收回3,800万美元税费的竞标

获取原文
获取原文并翻译 | 示例
           

摘要

Baltimore Gas and Electric may not saddle ratepayers with millions ofdollars of tax-related expenses that the Maryland utility failed tocapture in past years, the DC Circuit Court of Appeals said in a rulingupholding the Federal Energy Regulatory Commission’s rejection of theutility’s rate proposal.A December 2016 rate filing (ER17-528) from BGE proposed amechanism to refund or recover, as needed, certain deferred incometax excesses and deficiencies previously recorded and on an ongoingbasis. The proposal would have allowed BGE to recover from futureratepayers around $38 million in tax-related costs dating back to 2005for which consumers had not been charged.
机译:华盛顿巡回上诉法院在对联邦能源管理委员会拒绝公用事业费率提案的裁定中表示,巴尔的摩天然气和电力公司可能不会让纳税人承担数百万美元的税收相关费用,而这笔费用是马里兰州公用事业过去几年未能捕获的。 BGE的税率备案(ER17-528)提出了一种机制,用于根据需要退款或恢复以前记录的并持续存在的某些递延所得税超额和缺陷。该提议将使BGE可以从未来应纳税人那里收回大约3,800万美元的税收相关成本(可追溯至2005年),而消费者并未因此而向其付费。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号