Louisiana regulators await Cleco’s final integrated resource plan, including state's first wind generation

机译:路易斯安那州的监管机构正在等待Cleco的最终综合资源计划,包括该州的第一批风力发电

获取原文
获取原文并翻译 | 示例
       

摘要

Louisiana’s Cleco Power was due on November 27 to file its longdiscussed and final integrated resource plan with the Louisiana PublicService Commission that calls for at least 1,000 MW of wind generationin a state that currently has no installed wind capacity.The Pineville, Louisiana- based regulated utility holding company,which owns nine generating facilities with combined capacity of 3,310MW, said in earlier IRP filings with the LPSC staff that it is seekingapproval to also acquire 400 MW of solar generation.Six of Cleco’s generating facilities are fired by natural gas, while its628-MW Madison 3 facility is fueled by petcoke/coal. Its 638-MW DoletHills facility is fired by lignite, while its 493-MW Rodemacher 2 facilityoperates on Powder River Basin coal.
机译:路易斯安那州的Cleco Power将于11月27日向路易斯安那州公共服务委员会提交其讨论已久的最终资源综合计划,该计划要求在目前未安装风力发电能力的州至少产生1,000兆瓦的风力发电。该控股公司拥有9座发电设施,总容量为3,310兆瓦,在早些时候提交给LPSC员工的IRP文件中表示,它正在寻求批准也购买400兆瓦的太阳能发电。Cleco的6座发电设施使用天然气进行燃烧,而其628座-MW麦迪逊3电厂的燃料为石油焦/煤。它的638兆瓦的DoletHills设施由褐煤燃烧,而其493兆瓦的Rodemacher 2设施则使用粉河盆地的煤炭运行。

著录项

  • 来源
    《Platts Megawatt Daily》 |2019年第2期|3-3|共1页
  • 作者

    Jeffrey Ryser;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:54:04

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号