首页> 外文期刊>Platts Megawatt Daily >Tellurian to watch spending as commercial talks extend later than previously expected
【24h】

Tellurian to watch spending as commercial talks extend later than previously expected

机译:特柳里安(Tellurian)观察支出,因为商业谈判的进行时间比先前预期的晚

获取原文
获取原文并翻译 | 示例
       

摘要

Tellurian is reviewing its spending as commercial talks to secure sufficient equity agreements to finance its Driftwood LNG export project stretch into 2020, slightly later than previous estimates, CEO Meg Gentle said in an internal podcast posted on the company’s website Friday. The developer burned through cash, on an adjusted basis, at a rate of approximately $12 million a month in the third quarter, and some analysts have raised questions about its liquidity as it heads into a critical period for wrapping up commercial deals tied to the Louisiana project. Bank financing depends in part on the success of those efforts.
机译:首席执行官Meg Gentle周五在公司网站上发布的内部播客中说,Tellurian正在审查其支出,这是为了进行商业谈判以确保有足够的股权协议来为其2020年Driftwood LNG出口项目提供资金,比之前的估计稍晚。该开发商在调整后的基础上以每月约1200万美元的现金消耗掉了现金,一些分析师对它的流动性提出了质疑,因为它正进入包裹与路易斯安那州相关的商业交易的关键时期项目。银行融资部分取决于这些努力的成功。

著录项

  • 来源
    《Platts Megawatt Daily》 |2019年第11期|15-15|共1页
  • 作者

    Harry Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:46:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号