首页> 外文期刊>Platts Megawatt Daily >Ontario regulator clears NextBridge to construct transmission line
【24h】

Ontario regulator clears NextBridge to construct transmission line

机译:安大略省监管机构批准NextBridge建设传输线

获取原文
获取原文并翻译 | 示例
       

摘要

The Ontario Energy Board has awarded NextBridge Infrastructure, aconsortium that includes NextEra Energy, Enbridge and OMERSInfrastructure Management, a contract to build a 230-kV transmissionnetwork with a potential price tag of C$737 million (US$555.5 million).The regulator, known as the OEB, was directed by the provincialgovernment on January 31 to award the contract to get the longdelayedproject moving. In its Monday order the OEB said NextBridgecould build the 430-km line that will run from the Lakehead stationnear Thunder Bay, Ontario, to a station near Wawa, Ontario, along thenorthern shore of Lake Superior in the remote northwestern part of theprovince.
机译:安大略省能源委员会已授予NextBridge基础设施,一个由NextEra Energy,Enbridge和OMERS nInfrastructure Management组成的财团,该合同旨在建设230 kV输电网络,潜在价格为7.37亿加元(5.555亿美元)。 r n该监管机构(称为OEB)由省政府于1月31日指示授予该合同以延误已延期的项目。 OEB在其周一的命令中说,NextBridge n n可以建造一条430公里的线路,该线路将从安大略省的雷德黑德湖 n thunder湾附近延伸到安大略省Wawa附近 n的北部海岸苏必利尔湖位于该省偏远的西北部。

著录项

  • 来源
    《Platts Megawatt Daily》 |2019年第31期|9-9|共1页
  • 作者

    Gene Laverty;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:16:17

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号