首页> 外文期刊>Platts Megawatt Daily >Citing costs, stakeholders eye changes to Cal-ISO Aliso plan
【24h】

Citing costs, stakeholders eye changes to Cal-ISO Aliso plan

机译:引用成本,利益相关者关注变更Cal-ISO Aliso计划

获取原文
获取原文并翻译 | 示例
       

摘要

Stakeholders are seeking revisions to the California Independent System Operator’s plan to address ongoing limitations of the Aliso Canyon gas storage facility, with some parties claiming key measures have already significantly increased costs in the Cal-ISO market. Meanwhile, NRG Power Marketing is arguing that tight market conditions this past summer show why the US Federal Energy Regulatory Commission should require tweaks to the proposal to ensure plant dispatch better reflects high gas prices. “While the current CAISO tariff allows NRG to file to recover gas procurement costs that cannot be covered in the CAISO’s energy markets, all parties have a direct interest in reducing the likelihood [of] these extraordinary cost-of-service measures,” NRG said in a protest posted by FERC Tuesday.
机译:利益相关者正在寻求修订加利福尼亚独立系统运营商的计划,以解决Aliso Canyon储气库的持续限制,一些缔约方声称关键措施已经大大增加了Cal-ISO市场的成本。同时,NRG Power Marketing争辩说,去年夏天的市场紧缩表明了为什么美国联邦能源管理委员会应该对该提案进行调整,以确保工厂调度能更好地反映高汽油价格。 NRG说:“尽管当前的CAISO关税允许NRG申报收回CAISO能源市场无法涵盖的天然气采购成本,但各方都有直接兴趣降低这些非常规服务成本措施的可能性,” NRG表示。在FERC周二发表的抗议中。

著录项

  • 来源
    《Platts Megawatt Daily》 |2018年第207期|5-7|共3页
  • 作者

    Kate Winston;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 03:57:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号