首页> 外文期刊>Platts Megawatt Daily >PJM capacity market construct is 'elephant in the room' for states at NARUC
【24h】

PJM capacity market construct is 'elephant in the room' for states at NARUC

机译:PJM容量市场构建对NARUC州来说是“房间里的大象”

获取原文
获取原文并翻译 | 示例
       

摘要

Regulators in the states that fall within the PJM Interconnection's footprint might agree that the grid operator's capacity market design is failing, but they have not yet reached a clear consensus on what any replacement or modification should look like. PJM's ongoing efforts to protect its market-based capacity construct from the impacts of out-of-market state subsidies was a focus of discussion during the National Association of Regulatory Utility Commissioners' 2018 annual meeting in Orlando, Florida, on Monday. Illinois Commerce Commissioner John Rosales called out "the elephant in the room," slamming PJM's "inherently flawed and unnecessarily complex" capacity market construct for failing to send appropriate price signals to ensure a proper generation mix.
机译:处于PJM互联覆盖范围内的州的监管机构可能会同意电网运营商的容量市场设计正在失败,但是他们尚未就任何替换或修改的外观达成清晰的共识。 PJM持续努力保护其基于市场的能力建设免受市场外州补贴的影响,这是周一在佛罗里达州奥兰多举行的美国国家监管公用事业委员会协会年度会议上的讨论重点。伊利诺伊州商务专员约翰·罗萨莱斯(John Rosales)喊出“房间里的大象”,抨击PJM的“固有缺陷和不必要复杂”的容量市场结构,原因是未能发送适当的价格信号来确保适当的发电量组合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号