首页> 外文期刊>Platts Megawatt Daily >ERCOT panel OKs rule changes to enhance reliability, expedite transmission projects
【24h】

ERCOT panel OKs rule changes to enhance reliability, expedite transmission projects

机译:ERCOT面板确定规则更改以增强可靠性,加快传输项目

获取原文
获取原文并翻译 | 示例
       

摘要

A key Electric Reliability Council of Texas stakeholder committee onThursday approved rule changes designed to enhance reliability andtransparency, and to expedite transmission project development forfar West Texas, where oil-and-gas exploration is boosting loads quickly.On the reliability front, ERCOT's Technical Advisory Committeeapproved Nodal Protocol Revision Request 901, which enables ERCOTto establish a particular code for generation at the seams with othergrid operators, so that ERCOT knows the status of those units. Forexample, such "switchable" generation units may be operating andavailable to ERCOT or operating and committed to the neighboringgrid, or not operating at all.
机译:得克萨斯州电力可靠性委员会的主要利益相关方委员会在 r n周四批准了规则变更,旨在提高可靠性和 r n透明度,并加快在油气勘探不断发展的西德克萨斯州的输电项目开发 r n在可靠性方面,ERCOT的技术咨询委员会 r napproved了节点协议修订请求901,这使ERCOT r n可以与其他 r ngrid运营商在接缝处建立特定的代码生成,因此ERCOT知道这些单元的状态。例如,这样的“可切换”生成单元可能正在运行并且对ERCOT不可用,或者正在运行并提交给相邻的 r ngrid,或者根本不运行。

著录项

  • 来源
    《Platts Megawatt Daily》 |2018年第231期|3-4|共2页
  • 作者

    Mark Watson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 03:57:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号