首页> 外文期刊>Platts Megawatt Daily >PJM defends plan to include key gas-plant costs in offers
【24h】

PJM defends plan to include key gas-plant costs in offers

机译:PJM捍卫计划在报价中包括关键的天然气厂成本

获取原文
获取原文并翻译 | 示例
       

摘要

PJM Interconnection is standing behind its plan to allow natural gasfiredplants to include maintenance expenses in their cost-basedenergy market offers, saying the change is needed to put the plants onan equal footing with other types of generators that already put suchcosts into their offers.The plan is significant because the grid operator’s market monitorhas warned that it could boost energy prices. The proposal also failedto win support in PJM’s stakeholder process, but PJM decided to moveforward anyway.
机译:PJM互联公司正在支持其计划,以允许天然气电厂在其基于成本的能源市场报价中包括维护费用,并表示需要进行更改以使电厂与其他类型的电厂处于平等地位的计划已经很重要了,因为电网运营商的市场监测者已经警告说,这可能会提高能源价格。该提议也未能在PJM的利益相关者流程中赢得支持,但PJM决定继续前进。

著录项

  • 来源
    《Platts Megawatt Daily》 |2018年第238期|4-5|共2页
  • 作者

    Kate Winston;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 03:57:32

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号