首页> 外文期刊>Inside NRC >Federal court dismisses challenge to Turkey Point license renewal
【24h】

Federal court dismisses challenge to Turkey Point license renewal

机译:联邦法院向土耳其点许可续签驳回挑战

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A federal appeals court dismissed last month a suit filed byenvironmental groups challenging NRC's approval of operating licenserenewals for Florida Power & Light’s Turkey Point-3 and -4.The court documents of the March 4 ruling were released byNRC April 4.The renewal was the first so-called subsequent license renewalapproved by NRC to extend the operating license for a power reactor toallow it to operate for up to 80 years. Most US power reactors have hadtheir initial 40-year operating licenses extended for 20 years, and a fewmore have received subsequent renewals since Turkey Point.
机译:联邦上诉法院上个月被驳回了一个提起的诉讼 环境团体挑战NRC批准的运营许可证 佛罗里达电力和光的火鸡点-3和-4的续约。 3月4日裁决的法院文件被释放 NRC 4月4日。 续订是第一个所谓的后续许可证续订 通过NRC批准将电力反应堆的运营许可证扩展到 允许它运行长达80年。 大多数美国电力反应堆都有 他们初始的40年运营许可证延长了20年,还有一些 自土耳其点以来,更多已收到随后的续约。

著录项

  • 来源
    《Inside NRC》 |2021年第8期|4-4|共1页
  • 作者

    Kirstyn Petras;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号