首页> 外文期刊>Platts Energy Trader >California Energy Commission adopts process to expedite battery storage projects
【24h】

California Energy Commission adopts process to expedite battery storage projects

机译:加州能源委员会采用加速电池存储项目的过程

获取原文
获取原文并翻译 | 示例
       

摘要

The California Energy Commission approved a third order to complywith Governor Gavin Newsom’s emergency proclamation to reducestrain on energy infrastructure and ensure more clean energy capacitydue to projected shortfalls of 3.5 GW in 2021 and 5 GW in summer 2022.The order, approved Sept. 8, establishes a process for expeditinglicenses for new or existing battery storage systems of 20 MW or morethat are capable of discharging for at least two hours and will be ableto deliver net peak energy by Oct. 31, 2022, said Shawn Pittard, deputydirector for the commission’s Siting, Transmission, and EnvironmentalProtection Division.
机译:加州能源委员会批准了第三顺序以遵守 随着州长Gavin Newsom的紧急宣言减少 能源基础设施应变,确保更清洁的能量容量 由于2021年夏季2021年和5 GW的预计缺口为3.5 GW。 9月8日批准的订单建立了一个加速的过程 新的或现有电池存储系统的许可证为20 MW或更多 能够放电至少两个小时并且能够 在2022年10月31日,申请肖恩皮特拉德(副) 委员会选址,传输和环境总监 保护部门。

著录项

  • 来源
    《Platts Energy Trader》 |2021年第9期|24-25|共2页
  • 作者

    Kassia Micek;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 02:49:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号