...
首页> 外文期刊>Platts Energy Trader >California PUC approves plan to maintain Aliso Canyon at 34 Bcf storage capacity
【24h】

California PUC approves plan to maintain Aliso Canyon at 34 Bcf storage capacity

机译:加州PUC批准计划在34 BCF存储容量下维护Aliso Canyon

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The California Public Utilities Commission approved Nov. 19 to keep the interim range of Aliso Canyon storage capacity at 0 to 34 Bcf to maintain energy and electric reliability for the region. Several public comments were made during the Nov. 19 PUC meeting regarding the Aliso Canyon agenda item, many by community members expressing healthy and safety concerns relating to the natural gas storage facility. “You should be working to shut Aliso Canyon down because we should be moving to clean energy,” one commenter said. California Senate Bill 380 in 2016 tasked the PUC with determining the range of working gas necessary at the Aliso Canyon Natural Gas Storage Facility to ensure safety and reliability for the region and just and reasonable rates in California, according to filed documents. The Public Utilities Code instructs the PUC executive director, in consultation with the state oil and gas supervisor, to direct the operator of Aliso Canyon to maintain a specified range of working gas in the storage field.
机译:加州公用事业委员会批准于11月19日批准,将临时范围保持在0至34 BCF以保持该地区的能源和电力可靠性。有关Aliso Canyon议程项目的11月19日PUC次会议,许多公众评论是关于Aliso Canyon议程项目的讨论,表达与天然气储存设施有关的健康安全问题的社区成员。 “你应该努力关闭aliso峡谷,因为我们应该搬到清洁能源,”一位评论者说。加州参议院账单380在2016年任务任务PUC,并根据提交的文件,确定Aliso峡谷天然气储存设施中所需的工作天然气系列,以确保该地区的安全和可靠性以及加州的刚刚申请的合理率。公用事业代码指示PUC执行董事与国家石油和天然气监督员协商,以指示Aliso Canyon的操作员,以维持储存领域的指定工作天然气。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号