...
首页> 外文期刊>Platts Energy Trader >SPP, MISO eye new pseudo-tie provisions to aid coordination, grid reliability
【24h】

SPP, MISO eye new pseudo-tie provisions to aid coordination, grid reliability

机译:SPP,MISO着眼于新的伪领带条款,以帮助协调,提高电网可靠性

获取原文
获取原文并翻译 | 示例

摘要

Southwest Power Pool and Midcontinent Independent System Operator have proposed changes to their joint operating agreement to better coordinate and ensure grid reliability when generators within one region are controlled and dispatched by the neighboring region through a pseudo-tie. Pseudo-ties allow control of a generating unit or load to be transferred in real-time from the “native” balancing authority where the unit or load is physically located to an “attaining” BA in a different location.
机译:西南动力库和中陆独立系统运营商已提议对其联合运营协议进行更改,以更好地协调并确保一个区域内的发电机由伪区域控制和调度时,一个区域内的发电机。伪关系允许将发电单元或负荷的控制权实时地从物理上位于该单元或负荷的“本地”平衡机构转移到位于不同位置的“获得” BA。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号