...
首页> 外文期刊>Platts Energy Trader >Capacity to remain at zero through Friday on TETCO 30-inch line
【24h】

Capacity to remain at zero through Friday on TETCO 30-inch line

机译:TETCO 30英寸生产线到周五的产能将保持为零

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Southbound capacity through the nearly 2 Bcf/d Danville compressorstation on Texas Eastern Transmission will remain at zero until at leastFriday, according to a notice issued by Enbridge late last week.Capacity through the compressor station in central Kentucky hasbeen restricted since August 1 following a rupture and explosion thatkilled one and injured several others.
机译:根据Enbridge上周晚些时候发布的通知,通过德克萨斯州东部传输公司近2 Bcf / d Danville压缩机的南向运输量将保持为零,至少直到星期五。 r n通过压缩机站的运输量自8月1日以来,在肯塔基州中部的一次爆炸和爆炸致使一个人丧生,多人受伤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号