...
首页> 外文期刊>Platts Energy Trader >Anadarko reaches FI D on 12.88 mil mt/year Area 1 Mozambique LNG project
【24h】

Anadarko reaches FI D on 12.88 mil mt/year Area 1 Mozambique LNG project

机译:阿纳达科以1,288万吨/年的莫桑比克1区LNG项目到达FI D

获取原文
获取原文并翻译 | 示例

摘要

Houston-based Anadarko Petroleum and its partners in Mozambique'sOffshore Area 1 exploration area have taken a final investment decisionon the Area 1 Mozambique LNG project, Anadarko said Tuesday in astatement.This FID is a signal for construction to begin on what will be one oftwo large onshore LNG export projects planned for Mozambique, theother being the 15.2 million mt/year Rovuma LNG project led by an Eni-ExxonMobil joint venture that is expected to reach FID by the end of 2019.A third project in Mozambique is smaller and based on a floatingsystem, the Eni-led 3.4 million mt/year Coral South FLNG, which wassanctioned in June 2017 for commissioning in 2022.
机译:阿纳达科周二在一份声明中说,位于休斯顿的阿纳达科石油公司及其在莫桑比克近海1区勘探区的合作伙伴已经做出了最终投资决定,而不是莫桑比克1区LNG项目。是开始在莫桑比克计划的两个大型陆上LNG出口项目之一的信号,另一个是由Eni- r nExxonMobil牵头的1520万吨/年Rovuma LNG项目合资企业,预计将在2019年底达到FID。 r n莫桑比克的第三个项目规模较小,该项目以浮动系统为基础,该系统由Eni主导,年产量为340万吨,是由Coral South FLNG运营的,已于2017年6月批准在2022年投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号