...
首页> 外文期刊>Platts Energy Economist >Hydro hope for Nigerian power
【24h】

Hydro hope for Nigerian power

机译:水电希望尼日利亚发电

获取原文
获取原文并翻译 | 示例
           

摘要

Figures vary, but about 55% of all Nigerians lack any access toelectricity. Privatization has changed the face of the industry,but the problems are as big as ever. There is insufficientgeneration plant and a huge mismatch in terms of generatingand distribution capacity, forcing most Nigerians to eithercope without electricity or produce their own.The scale of the challenge is matched only by the ambition ofprevious, failed government targets, including a goal set in2010 that Nigeria should have more than 20 GW of mainlygas-fired generating capacity by 2020. Today it still strugglesto operate above 4 GW for a population of 186 million.
机译:数字各不相同,但所有尼日利亚人中约有55%没有电力供应。民营化改变了行业面貌,但问题却像以往一样大。发电设备不足,发电和配电能力严重不匹配,迫使大多数尼日利亚人要么没有电力就应对,要么自己生产。挑战的规模仅与先前失败的政府目标抱负相吻合,其中包括在2010年设定的目标到2020年,尼日利亚应该拥有超过20吉瓦的主要天然气发电能力。今天,它仍难以在4吉瓦以上的人口,1.86亿人口中运转。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号