...
首页> 外文期刊>Power in Europe >Terna, Gdf Suez Agree Jv
【24h】

Terna, Gdf Suez Agree Jv

机译:苏黎世Gdf苏黎世Terna同意成立合资企业

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

GEK-Terna and GDF Suez have agreed to enter a partnership with the two groups holding 50% stakes in the first two power plants of GEK Terna (Heron I and Heron II), the companies said December 18. According to the agreement, the management of the two plants will be conducted by both parties equally.rnBoth power plants are located in Viotia, about 120-km north of Athens. Heron I, the first private power plant in Greece, is a 150-MW open cycle gas fired power plant that has been in operation since 2004. Heron II, a 450-MW combined cycle gas-fired power plant, is being built by Terna and is scheduled to start commercial operation in the first quarter of 2010. The power plants will be owned and operated by the new joint venture.
机译:两家公司在12月18日表示,GEK-Terna和GDF Suez已同意与持有GEK Terna的前两个发电厂(Heron I和Heron II)50%股权的两个集团建立合作伙伴关系。两家电厂均由双方共同运营。两家电厂均位于雅典北部约120公里处的Viotia。 Heron I是希腊第一家私人发电厂,是一座150 MW的开放式循环燃气发电厂,自2004年以来一直在运行。Heron II是450 MW的联合循环燃气发电厂,由Terna建造。并计划于2010年第一季度开始商业运营。这些发电厂将由新合资企业所有并运营。

著录项

  • 来源
    《Power in Europe》 |2009年第542期|61|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号