...
首页> 外文期刊>Power in Europe >New life for Bremen coal unit
【24h】

New life for Bremen coal unit

机译:不来梅煤炭部门的新生活

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Modernization of SWB's Industriehafen coal unit 6 in Bremen was given the green light November 4 by the utility and its parent EWE. Work will begin in 2013 and take about 12 months. The unit's lifetime will then be extended to 2025, SWB told Platts. The work involves improvements to the turbine and steam cycle to raise efficiency by 2.5%, resulting in a 22 MW increase in capacity to 300 MW. Controls will also be modernized to increase operational flexibility. The 140 MW unit 5 at the site, commissioned in 1968, is held in cold reserve and is rarely used, SWB said. Total coal use of both units in 2009 amounted to 953,000 tonnes.
机译:该公用事业公司及其母公司EWE在11月4日批准了SWB不来梅工业燃煤6号机组的现代化改造。工作将于2013年开始,大约需要12个月。 SWB告诉普氏能源资讯,该装置的使用寿命将延长至2025年。这项工作涉及改进涡轮机和蒸汽循环以将效率提高2.5%,从而使容量增加22 MW,达到300 MW。控件也将现代化,以增加操作灵活性。 SWB说,该厂的140 MW 5号机组于1968年投入运行,目前处于冷藏状态,很少使用。两个单位在2009年的煤炭总使用量为953,000吨。

著录项

  • 来源
    《Power in Europe》 |2011年第613期|p.16-17|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号