...
首页> 外文期刊>Power in Europe >Wpd seeks Butendiek funding
【24h】

Wpd seeks Butendiek funding

机译:WPD寻求Butendiek资金

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

WPD offshore GmbH is seeking up to €450 million from the European Investment Bank towards the €1,290 million cost of the 288-MW Butendiek offshore wind farm in the German North Sea, EIB records showed September 12. The project involves construction of 80 3.6-MW wind turbines on monopole foundations some 53-km from shore and 34-km from the island of Sylt, the EIB said. The wind farm concession covers an area of 33 sq km at a water depth between 17 and 23 meters. Meanwhile Bremenports GmbH & Co has applied for funding of up to €100 million of EIB funding towards the €200 million cost of an offshore terminal south of Bremerhaven on the Weser River to handle, pre assemble and store offshore wind turbines.
机译:EIB记录显示,9月12日,WPD Offshore GmbH正在向欧洲投资银行寻求高达4.5亿欧元的资金,以支付12.90亿欧元的德国北海288 MW Butendiek海上风电场的成本。该项目涉及80 3.6 EIB称,单极地基上的兆瓦级风力发电机距海岸约53公里,距叙尔特岛约34公里。风电场特许权的面积为33平方公里,水深在17至23米之间。同时,不来梅港公司已申请高达1亿欧元的EIB资金,用于不来梅港南部威悉河上2亿欧元的离岸码头成本,以处理,预组装和存储离岸风力涡轮机。

著录项

  • 来源
    《Power in Europe》 |2011年第609期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号