...
首页> 外文期刊>Power in Europe >Suckow wind farm advances
【24h】

Suckow wind farm advances

机译:Suckow风电场取得进展

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

SudWestStrom has appointed Nordex to build the 32.5-MW Suckow wind farm in Ludwigslust-Parchim, Mecklenburg, Germany, the turbine manufacturer said November 6.The operator and final customer is SudWestStrom Windpark Suckow, a cooperative based in Tubingen owned by various German municipal utilities, Nordex said.In all the wind farm has six private investors, a private cooperative and ten municipal utilities including Sudwestdeutsche Stromhandels, which initially bought the project before transferring it to participating utilities and private investors.
机译:该涡轮机制造商于11月6日表示,SudWestStrom已任命Nordex在德国梅克伦堡的路德维希卢斯特-帕奇姆市建立32.5兆瓦Suckow风力发电场,该涡轮机制造商和最终客户是SudWestStrom Windpark Suckow,这是一家位于德国图宾根的合作社,由德国多家市政公用事业公司拥有Nordex表示,在整个风电场中,有六个私人投资者,一个私人合作社和包括Sudwestdeutsche Stromhandels在内的十个市政公用事业公司,它们最初购买了该项目,然后将其转让给参与的公用事业和私人投资者。

著录项

  • 来源
    《Power in Europe》 |2012年第638期|p.15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号