...
首页> 外文期刊>Power in Europe >Spanish regulator clears way for Anllares closure
【24h】

Spanish regulator clears way for Anllares closure

机译:西班牙监管机构为关闭Anllares开辟道路

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The plant produced 909 GWh last year, operating for justrnover 3,000 hours, according to data from system operatorrnRed Electrica. Anllares had operated at or above its 2017rnoutput figure in most years since 2011, the data showed.rnAn official at the Comision Nacional de los Mercados y larnCompetencia (CNMC) said July 18 the body had published arnreport saying it had no objection to the closure asrnrequested in May last year by the operators Naturgyrn(formerly Gas Natural) and Endesa, which own two-thirdsrnand one-third of the Leon-based plant respectively.
机译:根据系统运营商Red Electrica的数据,该工厂去年生产了909 GWh,仅运转了3,000个小时。数据显示,自2011年以来,Anllares多数年份的产量一直在2017年或以上的水平.rnComes Nacional de los Mercados y larn Competencia(CNMC)的一名官员表示,该机构7月18日发布了arnreport报告,称它不反对要求关闭去年5月,运营商Naturgyrn(以前称为Gas Natural)和Endesa分别拥有莱昂工厂的三分之二和三分之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号