...
首页> 外文期刊>Energy in East Europe >Gas shale flows disappoint 3Legs
【24h】

Gas shale flows disappoint 3Legs

机译:瓦斯页岩气令人失望3腿

获取原文
获取原文并翻译 | 示例
           

摘要

UK-listed explorer 3Legs Resources, which through its subsidiary Lane Energy was the first company to use hydraulic fracturing in Poland, said November 16 it had completed its 2011 drilling and appraisal program, with the results less positive than hoped. 3Legs said the Warblino LE-1H2 horizontal well flowed at an initial rate of 6,000-9,000 Mcf/day of gas, which declined after five days of testing to about 1,800 Mcf/d at which point the well was shut in. 3Legs CEO Peter Clutterbuck said although the flow rates from this and another frack were low, the company is still optimistic they can be raised. "We have now concluded our 2011 drilling and testing program for the Baltic Basin, which has achieved its objectives of completing two wells with horizontal sections and multistage fracks," Clutterbuck said.
机译:在英国上市的勘探公司3Legs Resources通过其子公司Lane Energy是波兰第一家使用水力压裂的公司,该公司表示,11月16日,该公司已经完成了2011年的钻探和评估计划,其结果不及预期。 3Legs表示,Warblino LE-1H2水平井的初始流量为每天6,000-9,000 Mcf /天,经过五天的测试后下降至约1,800 Mcf / d,此时关闭了该井。3Legs首席执行官Peter Clutterbuck他说,尽管由此造成的流量较低,但该公司仍乐观地希望将其提高。 “我们现在已经完成了波罗的海盆地2011年的钻探和测试计划,该计划已经实现了完成两口水平段和多级压裂井的目标,” Clutterbuck说。

著录项

  • 来源
    《Energy in East Europe》 |2011年第227期|p.30-31|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号